Ongoing · Now booking
Kuhu Heights
Civil Lines, Bareilly, Uttar Pradesh, Bareilly
UP RERA No. UPRERAPRJ-SAMPLE-001
Overview
Every home has cross-ventilation, a balcony and a dedicated covered parking space. Each floor has only four apartments, so you share fewer walls and get better light and air.
Specifications
- Structure: RCC framed structure designed as per applicable IS codes, fly-ash brick masonry
- Flooring: Vitrified tiles in living area and bedrooms, anti-skid tiles in balconies and bathrooms
- Kitchen: Granite platform with stainless steel sink, tiled dado above the platform
- Bathrooms: Branded CP fittings, concealed plumbing, geyser point in every bathroom
- Doors & windows: Flush main door with quality hardware, powder-coated aluminium windows
- Electrical: Copper wiring with modular switches, AC points in all bedrooms
- Paint: Putty-finish internal walls, weather-proof external paint
Specifications are indicative. The final list is part of the sale agreement.
Price list
| Type | Carpet area | Super area | Price | |
|---|---|---|---|---|
| 2 BHK — Type A | 985 sq ft | 1,290 sq ft | ₹ 48.5 L | Get cost sheet |
| 2 BHK — Type B | 1,065 sq ft | 1,395 sq ft | ₹ 52 L | Get cost sheet |
| 3 BHK — Type A | 1,320 sq ft | 1,720 sq ft | ₹ 64 L | Get cost sheet |
| 3 BHK — Type B | 1,420 sq ft | 1,850 sq ft | ₹ 69 L | Get cost sheet |
*Prices exclude registry, GST and other charges where applicable. Ask for the full cost sheet.
Floor plans

Amenities
- Gym
- Lift
- Covered parking
- Gated entry with CCTV
- Power backup
- Park & green area
- Rainwater harvesting
- 24×7 water supply
- Children's play area
- Clubhouse
- Solar street lighting
Location
- Bareilly Junction railway station~10 min
- CBSE schools & coaching centres~5 min
- Multi-speciality hospitals~8 min
- Civil Lines main market~5 min
- Highway / bypass access~15 min
Construction progress
62% complete
Frequently asked questions
Is Kuhu Heights RERA registered?
Yes. The UP RERA registration number is shown on this page. You can also verify it on the official UP RERA website before booking.
What is the target possession date?
Possession is targeted for December 2027, as per the timeline declared under RERA. Monthly construction photos are posted on this page.
Which banks give a home loan for this project?
Most leading banks and housing finance companies lend for new apartments. Our team helps with the documents and coordinates with the bank.
